IS 11189 : 2020
Methods of Tubewell Development ( First Revision )
Current edition: 2020
Sectional committee: MED 21 · BIS department: Mechanical Engineering (MED)
Edition history (per the BIS registry)
- IS 11189 : 2020 — current edition (last reviewed by BIS 2025-03-01)
Where this standard is used on NirmanDost
CPWD DSR 2021 (Civil Works)
| Item code | Description (verbatim) |
|---|---|
| 23.12 | Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, runnin… |
Notes
- Status and titles come from the official BIS published/withdrawn standards registry (standards.bis.gov.in exports, July 2026 snapshot). Editions change — verify on the BIS portal before contractual use.
- The standard text is copyright BIS. NirmanDost shows registry metadata and links to the official source only — it never rehosts the document.
- Generated 2026-07-27.