🌐
Smart Civil Rate Analysis
Delhi DSR 2021
Loading… 26 Subheads Rate Analysis
Plain-language rate recipes
How DSR codes work
4.1.3
Subhead
4 · Concrete Work
Group
Plain Cement Concrete
Variant
Mix 1:2:4
Some codes have 2 parts (e.g. 6.1) or 4 parts (e.g. 18.1.3.2) — deeper = more specific variant
Why rates look lower than market
These are CPWD DSR 2021 base rates for Delhi — the government's reference book, not today's market in your city. CPWD itself applies a quarterly Cost Index on top of these base rates for each station, and 2026 market rates typically run above the 2021 base.

How to use them well: treat DSR as the structure (what an item includes, its unit, its labour+material breakup) and negotiate the percentage above DSR, not the absolute number. For your own pricing, open BOQ Builder → 🔧 Rate Library and punch in your local cement / sand / mason rates — every analysis-backed item recalculates from your basic rates, exactly how a contractor builds a quote.
Code Description Subhead Unit DSR Rate
Loading DSR 2021 data…
AI Project Estimator
Describe your project in plain language — Claude maps it to DSR 2021 items and generates a complete itemized BOQ with quantities and rates.
✨ Uses 2 credits per estimate
Auto DSR matching · IS-code quantities · PDF export
Project Type
BOQ Builder
Bill of Quantities
Name of Work:
Estimate No.:
Client:
Date:
0 items ← enter quantities below
Loading DSR rates…
📊 Cost Analysis
Base Cost DSR 2021 ₹0
e.g. Water, Cess, Contingency
Total Project Cost ₹0
Built-up area sqft
🏗 Need to buy materials?
Compare prices from verified local suppliers on NirmanDost
Get Supplier Quotes →
Prepared by
Checked by
Approved by
0 items · 0 with qty Sub-total ₹0 · Grand Total ₹0 ₹0 total · 0 items
Contractor Quote Validator
Upload a photo or PDF of your contractor's quote — or paste the text. Each item is matched against CPWD DSR 2021 rates, flagging anything overpriced, with a ready-to-send negotiation script.
✨ Uses 2 credits per validation
Every rate vs CPWD DSR 2021 · Overpriced items flagged · Negotiation summary
Upload or Paste Your Contractor's Quote
Photo of the quotation, the PDF he WhatsApped you, or just paste the text — each line item gets checked against CPWD DSR rates.
Upload quote photo or PDF
JPG · PNG · WEBP · PDF — up to 10 MB
and / or paste text
Unit
DSR Rate
Category