IS 1322 : 1993
Bitumen Felts for Water Proofing and Damp-proofing - Specification (Fourth Revision)
Current edition: 1993
Sectional committee: CED 41 · BIS department: Civil Engineering (CED)
What this standard covers
This standard covers the requirements for saturated bitumen felts ( underlay ) and self- finished bitumen felts used for water-proofing and damp-proofing.
Scope, quoted from IS 1322 : 1993. Read the full standard
Requirements and tests, as the standard names them
- 9.1 Sampling
- 9.1.3 Test Samples and Number of Tests
- 9.1.4 Criteria for Conformity
Sub-clause names as printed under the heading “SAMPLING AND CRITERIA OF CONFORMITY” in IS 1322 : 1993. Values and limits are deliberately not reproduced here — read them in the standard itself.
How the standard is organised
- 3 CLASSIFICATION
- 4 MATERIALS
- 5 MANUFACTURE
- 6 DIMENSIONS
- 8 TESTS
- 9 SAMPLING AND CRITERIA OF CONFORMITY
- 10 PACKING AND MARKING
Test methods it refers to
- IS 13826
Edition history (per the BIS registry)
- IS 1322 : 1993 — current edition (last reviewed by BIS 2022-12-01)
Where this standard is used on NirmanDost
CPWD DSR 2021 (Civil Works)
| Item code | Description (verbatim) |
|---|---|
| 22.8.1 | Bitumen felt (hessian base) type 3 grade I conforming to IS : 1322 |
| 22.9 | Providing and laying six courses water proofing treatment with bitumen felt over roofs consisting of first, third and fifth course of blown bitumen 85/25 or 90/15 conforming to IS : 702 applied hot @ 1.45, 1.20 and 1.45 … |
Open these items in CivicMate →
CPWD DSR E&M 2022
| Item code | Description (verbatim) |
|---|---|
| 16.1.1 | Supplying, laying/ fixing, testing and commissioning of following nominal sizes of chilled water piping inside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges… |
| 16.1.2 | Supplying, laying/ fixing, testing and commissioning of following nominal sizes of chilled water piping inside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges… |
| 16.1.3 | Supplying, laying/ fixing, testing and commissioning of following nominal sizes of chilled water piping inside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges… |
| 16.1.4 | Supplying, laying/ fixing, testing and commissioning of following nominal sizes of chilled water piping inside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges… |
| 16.1.5 | Supplying, laying/ fixing, testing and commissioning of following nominal sizes of chilled water piping inside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges… |
| 16.1.6 | Supplying, laying/ fixing, testing and commissioning of following nominal sizes of chilled water piping inside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges… |
Pick up from here
CivicMateSearch 4,300+ CPWD DSR and municipal SOR items, then build a priced BOQ.Open CivicMate →
Nirman AI on WhatsAppMessage NirmanDost on WhatsApp — the same AI answers you there. No app, no sign-up.Ask on WhatsApp →
Get listed on NirmanDostCreate a free account, list your business and showcase your work — customers find you here.Create free account →
Notes
- Status and titles come from the official BIS published/withdrawn standards registry (standards.bis.gov.in exports, July 2026 snapshot). Editions change — verify on the BIS portal before contractual use.
- The standard text is copyright BIS. NirmanDost shows registry metadata and links to the official source only — it never rehosts the document.
- Generated 2026-07-27.