Why rates look lower than market
These are CPWD DSR 2021 base rates for Delhi — the government's reference book, not today's market in your city. CPWD itself applies a quarterly Cost Index on top of these base rates for each station, and today's market rates typically run above the book's base year.

How to use them well: treat DSR as the structure (what an item includes, its unit, its labour+material breakup) and negotiate the percentage above DSR, not the absolute number. For your own pricing, open BOQ Builder → Rate Library and punch in your local cement / sand / mason rates — every analysis-backed item recalculates from your basic rates, exactly how a contractor builds a quote.
Code Description Unit DSR Rate
Loading DSR 2021 data…
AI Project Estimator
Describe your project in plain language — Claude drafts a preliminary takeoff, then matches each work item to a CPWD DSR 2023 civil or E&M 2022 rate and prices it. Quantities are thumb-rule estimates from your words, not measurements off a drawing: check them before you order or quote.
Uses 2 credits per estimate
Auto DSR matching · Preliminary AI takeoff · Print / PDF
Project Type
BOQ Builder
Bill of Quantities
Name of Work:—
Estimate No.:—
Client:—
Date:—
Project details (optional)
0 items ← enter quantities below
Loading DSR rates…
Cost Analysis ▲
Base Cost DSR 2021 ₹0
e.g. Water, Cess, Contingency
Total Project Cost ₹0
Built-up area sqft —
Need to buy materials?
Compare prices from verified local suppliers on NirmanDost
Get Supplier Quotes →
Prepared by
Checked by
Approved by
0 items · 0 with qty Sub-total ₹0 · Grand Total ₹0 ₹0 total · 0 items
Contractor Quote Validator
Upload a photo or PDF of your contractor's quote — or paste the text. Each item is matched against CPWD DSR 2023 civil and E&M 2022 (Delhi) reference rates, flagging anything well above them, with a ready-to-send negotiation script. A Delhi schedule is a reference, not today's local market price.
Uses 2 credits for every 10 lines of the quote (1-10 lines: 2, 11-20: 4, and so on)
Every rate vs CPWD DSR 2023 civil + E&M 2022 · Items well above the reference flagged · Negotiation summary
Upload or Paste Your Contractor's Quote
Photo of the quotation, the PDF he WhatsApped you, or just paste the text — each line item gets checked against CPWD DSR rates.
Upload quote photo or PDF
JPG · PNG · WEBP · PDF — up to 10 MB
and / or paste text
—
—
— per —
See CPWD's working
More about this rate