Enter your mobile — we'll send a 6-digit OTP. No password needed.
+91
My Projects
Loading…
Rate Library
Project resource rates
Save Project
Give this estimate a name so you can find it later.
Material Takeoff
Your BOQ's shopping list — every quantity computed from the CPWD rate-analysis recipe behind each item. Confirm final quantities with your contractor before ordering.
Some codes have 2 parts (e.g. 6.1) or 4 parts (e.g. 18.1.3.2) — deeper = more specific variant
Why rates look lower than market
These are CPWD DSR 2021 base rates for Delhi — the government's reference book, not today's market in your city.
CPWD itself applies a quarterly Cost Index on top of these base rates for each station, and 2026 market rates
typically run above the 2021 base.
How to use them well: treat DSR as the structure (what an item includes, its unit, its labour+material breakup)
and negotiate the percentage above DSR, not the absolute number. For your own pricing, open
BOQ Builder → Rate Library and punch in your local cement / sand / mason rates — every analysis-backed item
recalculates from your basic rates, exactly how a contractor builds a quote.
Code
Description
Subhead
Unit
DSR Rate
Loading DSR 2021 data…
AI Project Estimator
Describe your project in plain language — Claude drafts a preliminary takeoff, then matches each work item to a CPWD DSR 2021 rate and prices it. Quantities are thumb-rule estimates from your words, not measurements off a drawing: check them before you order or quote.
Uses 2 credits per estimate
Auto DSR matching · Preliminary AI takeoff · Print / PDF
Project Type
BOQ Builder
Bill of Quantities
Name of Work:—
Estimate No.:—
Client:—
Date:—
0 items← enter quantities below
Loading DSR rates…
Cost Analysis▲
Base Cost DSR 2021₹0
e.g. Water, Cess, Contingency
Total Project Cost₹0
Built-up area
sqft
—
Need to buy materials?
Compare prices from verified local suppliers on NirmanDost
0 items · 0 with qtySub-total ₹0 · Grand Total ₹0₹0 total · 0 items
Share this BOQ
Anyone with this link can view your BOQ read-only — no login needed — or open it as their own editable copy in the Builder.
The link itself carries the BOQ: items with their DSR code and book, quantities and measurement sheets, adopted and DSR rates, overheads, estimate no. and signatures. Not carried: rate-library overrides, other versions.
Keep it private if the project is confidential. Link does not expire.
Contractor Quote Validator
Upload a photo or PDF of your contractor's quote — or paste the text. Each item is matched against CPWD DSR 2021 rates, flagging anything overpriced, with a ready-to-send negotiation script.
Uses 2 credits per validation
Every rate vs CPWD DSR 2021 · Overpriced items flagged · Negotiation summary
Upload or Paste Your Contractor's Quote
Photo of the quotation, the PDF he WhatsApped you, or just paste the text — each line item gets checked against CPWD DSR rates.