What's the CPWD DSR rate for foundation trench excavation, per cum?
Earthwork in excavation for foundation trenches (up to 1.5m width), all kinds of soil, including dressing sides, ramming the bottom and disposing surplus soil within a 50m lead.
The recipe
| Code | Description | Unit | Rate | Qty | Amount |
|---|---|---|---|---|---|
| 2.8.1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | cum | ₹286.85 | 1 | ₹286.85 |
| Total | ₹286.85 | ||||
Notes
- Rates shown are CPWD Delhi base rates from DSR 2021 (CPWD), edition 2025 — apply your local market / cost-index variation.
- Generated 2026-07-27.