What's the CPWD DSR rate for a telephone socket point?

Same build-up pattern as a TV point — conduit, a telephone-pair cable, a socket outlet and a box.

Preliminary Using CPWD DSR E&M 2022 item rates as published, this worked scenario adds up to ₹1,215 (items 1.21.1, 1.18.1, 1.24.6, 1.27.1, 1.28.1). The item rates are CPWD's Delhi base rates; the quantities and the item mix are NirmanDost's scenario, not a CPWD bundle — adjust both to your site and apply your local cost index.

The recipe

CodeDescriptionUnitRateQtyAmount
1.21.1 Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required — 20 mm4 metre PVC conduit run Metre ₹128 4 ₹512
1.18.1 Supplying and drawing following pair 0.5 mm dia FRLS PVC insulated annealed copper conductor, unarmored telephone cable in the existing surface/ recessed steel/ PVC conduit as required — 1 Pair4 metre, 1-pair telephone cable Metre ₹31 4 ₹124
1.24.6 Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required — Telephone socket outlet Each ₹148 1 ₹148
1.27.1 Supplying and fixing following size/ modules, GI box along with modular base & cover plate for modular switches in recess etc as required — 1 or 2 Module (75mmX75mm) Each ₹298 1 ₹298
1.28.1 Supplying and fixing following Modular base & cover plate on existing modular metal boxes etc. as required — 1 or 2 Module Each ₹133 1 ₹133
Total₹1,215

What goes into one unit

Straight from CPWD's own rate analysis for these items — the material and labour they price into the rate above, per one unit of the item. Multiply by your quantity to get a shopping list. Carriage lines are left out: those pay for moving the material, not for extra material.

One Metre of item 1.21.1 — Supplying and fixing of following sizes of medium class PVC

ItemQtyUnitIn site terms
20 mm iron staples/ saddles/ screws1.7each
PVC fastener 40mm long1.7each
20 mm dia. ISI marked, PVC conduit1.05metre
20 mm PVC couplers0.3each
20 mm PVC bends0.08each
Cement, paint, sand etc.0.02L.S.
Khallasi0.04day
Wireman0.025day
Mason, Grade 20.015day

CPWD prices this item for a lot of about 50 metre and brings it to one metre with its own factor (Rate per meter, x 0.02); the quantities above already include that step.

One Metre of item 1.18.1 — Supplying and drawing following pair 0.5 mm dia FRLS PVC ins

ItemQtyUnitIn site terms
1 pair, 0.5 mm dia annealed copper conductor, FRLS PVC insulated, unarmoured, telephone cable1.06metre
Wireman0.01day
Khallasi0.01day

CPWD prices this item for a lot of about 50 metre and brings it to one metre with its own factor (Rate per meter, x 0.02); the quantities above already include that step.

One Each of item 1.24.6 — Supplying and fixing following modular switch/ socket on the

ItemQtyUnitIn site terms
Telephone Socket outlet modular type1each
Wireman0.03day
Khallasi0.03day

One Each of item 1.27.1 — Supplying and fixing following size/ modules, GI box along w

ItemQtyUnitIn site terms
PVC fastener 40mm long2each
Modular GI box for 2 module1each
Modular base & cover plate for 2 module1each
Cement, paint, sand etc.1L.S.
Khallasi0.1day
Mason, Grade 20.06day
Wireman0.04day

One Each of item 1.28.1 — Supplying and fixing following Modular base & cover plate on

ItemQtyUnitIn site terms
Modular base & cover plate for 1 module1each
Wireman0.04day
Khallasi0.04day

Rates and quantities are CPWD's published figures, not a market quotation. Local rates differ — you can override them in the BOQ Builder.

Notes

  • Rates shown are CPWD Delhi base rates from CPWD DSR E&M 2022, as published (our extract of the book is dated 2026-06-12) — apply your local market / cost-index variation.
  • CPWD has published later editions since (its site lists DSR E&M 2025); the 2022 figures here are reference rates, not the schedule in force for a current tender.
  • The item mix and quantities on this page are a NirmanDost worked scenario; the rates, units and descriptions in each row are CPWD's, verbatim. Every code opens in CivicMate for the source row.